The company was established with a surface area of 6,800 m2 and an industrial building of 1,200 m2
Enero
The premises were extended to 11,800 m2 of land and 4000 m2 of industrial buildings
Replacement of the fuel oil galvanizing furnace by natural gas and the installation of a waste heat recovery unit of exhaust gas
Design of a gas capture and filtration system Euro-in Technology
Adaptation of processes to an Environmental Management System with zero dumping Installation of hood, filters and fluxing regenerator
Founding of DICOME, an auxiliary company manufacturing electrical material First environmental assessment by Novotec
Extension of the galvanizing furnace to 12.5 x 1.75 x 2.5 m
Quality System Certification according to UNE-EN-ISO 9002 by BVQI
Participation in the “Euromanagement environment” initiative of the European Commission to promote the implementation of EMS in SMEs
Implementation of an Environment Management System according to EMAS European Regulation 1836/93 and Validation of the Environmental Declaration by BVQI
Participation in the “Euromanagement environment” initiative of the European Commission to promote the implementation of EMS in SMEs
Participation in the Bre-ct-97 5187 and In 20507 projects within Craft and Inodgi European programmes. Assessment of depleted stripping and emission control
Extension of our surface area to 25,800 m2 and of our a constructed surface area to 11,080 m2. Implementation of the Occupational Hazard Prevention System according to UNE 81.900
Certification of the Occupational Hazard Prevention System by BVQI and unification with Quality and Environment in an Integrated Management System
Restructuring of the load movement and material pre-processing systems with the extension of stripping work. This initiative was selected by the Fundación Entorno for its Eco-Efficiency Programme 2001 and financed by the General Directorate of Environmental Quality
Adaptation of the Process Management System to the OHSAS 18000 Standard
Certification of the Integrated Management System with OHSAS 18000
Extension and adaptation of pre-processing to a length of 14.5 m
Participation in the Total Quality PREMIER Programme and the Corporate Social Responsibility ETHOS Programme
Participation in the Occupational Hazard Prevention Programme of the Galvanization sector with the Fundación para la PRL, Ateg and Eurocualitas
Attainment of the Integrated Environmental Authorization
Extension of the stripping facility and circuit-II load movement facility
Development of a project to implement a new processing line. Participation in the PREVEA programme on occupational hazard prevention
Implementation of a new galvanizing line with a 14.5 x 2.1 x 3.5 m, furnace. Energy Saving and Efficiency Strategy Project, financed by the IDAE (MINER) and by the Department of Environmental Quality of the Aragón Provincial Council
Expansion of the useful area up to 32,600 m2 and built area up to 16,000m2, with the purchase of an adjoining plot of 6,800m2.
Certification of the Process Management System to the ISO 45001 standard.
CEPYME500 Award to one of the most relevant Medium-sized Companies in the country.